Search This Blog

Saturday, September 15, 2012

The water line

As part of putting this farm in to use for cattle, we needed to install three freeze proof waterers. We will

have electric fences seperating the place in to five different paddocks as we are planning on utilizing

rotational grazing. That required a backhoe to come and dig the water line.  It needs to be approximatley

24" in our area as that is the freeze line.  First, in the country you've got to find out who has a backhoe

and when they can come.  So, after asking around, a name comes up, you ask around about their

reputation and then you give them a call.  You have to find out what they charge and if they can do the

job.  Then find out when they can come and hopefully they show when they say they will.  Before the

digging even started, we located a plastic pipe manufacturing facility that was fairly close (35 miles) and

spoke with them about purchasing 3000 feet of pipe.  No problem....they have what we need.  So we load

up in the wonderful green and white dump truck and head off to get our pipe.  The lines all get dug

and now comes the part of laying out the pipe and glueing them together.  Everything works pretty


good...we have a few snags such as a few of the pipe pieces not fitting snugly enough together to make

a good seal.  Somewhere in quality control, they missed these pieces.  So....you cut them apart and

reapply the glue and move on down the line.  Once the pipes are all laid and a riser attached, then

comes building forms for the concrete that will be poured to be under the waterers.

1 comment:

  1. I really empathise with your way of finding tradesman, we are new to the area here and word of mouth has been so key in finding good workman

    I look forward to hearing more about your cows

    ReplyDelete