Saturday, January 26, 2013

The clutter has been cleared from the moving boxes!

It's time for some pictures to be posted of our beautiful new home!  We are now living comfortably in

our new space.  When you search, look and plan for designs, you imagine yourself living in that

space.  I think we did a great job as we feel pretty comfortable in this new home.  I've spent the last 2

months toting things from the shop building next door that we lived in during the building process. 

I'm still moving some small things but for the most part everything is put away.  I'm sure though that

I'll be shuffling some of these things as I find how I use them in the new space.  And, we didn't have

a linen closet built any where so that is still something to be added by our cabinet man when he

finishes our banister.   But, if that's the only thing that we over looked.....then I think we did a pretty

good job!   Since this would be such a long post to describe each picture and room.....I'll take a few of

them at a time.  I'll try to describe what we've done and add in some pictures...there's still work to be

done.

So....getting right along with it......

When you come in the back door, you come into the utility room or some people call them mud

rooms.   Regardless....we need a place to come in...take off shoes.....hang up coats .....do laundry.











This is where we hang our coats and jackets.  It was originallly framed for a door, but in thinking about it....we didn't put a door on it.  Make it as easy as possible and the coats will get hung up. We did add beadboard to make it a little more visually appealing and then hung hooks that we already had.  We also gave it a coat of paint....a warm green...different color than the walls.    I like it!! Works pretty good!





After living with this for a few weeks.....I think I might have to add a couple more hooks down low for more hanging space













































Monday, January 21, 2013

Building the House

 
This was the beginning.....pouring the stem walls for the foundation!!
 
 
 
 
 
 
 


 


 
 



 
 




 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 



 


 
 
 
 
 



 

 
 
 
 
 
 

Tuesday, January 15, 2013

The insulation

As we began to think about building, we drew on our knowledge, both current and past, of energy

effeciency.  We built a house about 29 years ago and it was, to a degree, passive solar.  We situated

the house so that the side with the most windows, were on the south side and the north side had no

windows.  But, as with all things, the building industry has changed.  Insulation has become more

efficient with the use of the sprayed foam.  It can cover cracks and openings that you can't even see! 

The crew that we had do ours even sealed the area around the doors and windows.  I don't think we'll

have any air leaks in this house. 





Windows have also improved considerably.  It is now very common to be able to get "Low E".   In

the sunroom which is situated on the south side of the house, has windows that are not "Low E" so

that we can gain as much solar heat as possible.  You can definitely feel the warmth on sunny

days...so much so that if it is fairly warm outside, I've had to close the doors between the sunroom

and the rest of the house!

Monday, December 10, 2012

Moving in!

I need to bring y'all up to date on what's happening with the house.  We began construction on August 3rd.  It was so terribly hot

during part of our construction.  Those poor guys were working out there when it was over 100 degrees and we certainly do

appreciate them for it.



After all this time, we were finally able to make the big move into the house on the second weekend in November.  Aaron, Rachael

and Chloe came down from Ozark and Joe came over from NW Arkansas.  We used an enclosed trailer of my dad's which certainly

made it a lot easier.  Doing it this way you don't have to be so concerned with how things are tied down....and there's no chance of

anything blowing out.   It's so embarrassing to be going down the highway, have something catch your attention and it be something

blowing across the road behind you.   And heaven forbid it be something that hits another car!!   Anyway, we moved in knowing

that the house wasn't completely finished yet, but living in that shop building with no windows was about to drive us buggy!!  

The house did not have cabinets in the kitchen or vanities in the bathrooms, but we had a bathtub, shower and toilets....that's

enough for us!!   Oh...and did I mention there are WINDOWS !!  Big, glorious, wonderful windows.   We can now actually sit inthe

house and look out!    The shop that we were living in before had no windows, so if was raining or cold, the roll up doors were

down.  It certainly makes it more cozy and comfortable....but I like looking out!

 We moved the big furniture and set up housekeeping!!  That's when the unpacking of boxes began.  But, since there are no cabinets,

only clothes and bedding can be unpacked,  I'm trying to be patient!!!!!

Friday, September 28, 2012

Getting here.

Just getting here to the farm can be an adventure in itself.   If you come from the south, you

have to, or get to (depending on your attitude) ride the ferry.  This is one of the last ferries in

AR and it is operated by the Highway Department.  It only runs during the daylight hours, so



it can put a damper on your traveling.  You've got to restrict your traveling to daylight

hours only or go around the other way which can add many miles and lots of time to your trip.  It also

won't run if there is dense fog or extremely high winds.

There is a schedule for arrivals and departures, so unless you want to sit and wait the 40

minutes it takes for the ferry to make a round trip, you look at the schedule and plan.  We

know how long it takes us to leave the farm and get to the ferry, so that we don't have that

time to sit and wait.  It can be a social event though.  There have been many times that

we've seen people open their trunks or get into the cooler in the back of their truck to have

a cool drink of water or soda while waiting.  There's also a lot of visiting that goes on. 

Catching up with the neighbors or finding out where the other travelers are from is usually

the topic of discussion.  This route is very popular with motorcyclists and many times they

are from other areas and interested in what else is in the area.  That's when we get to brag

on our little area of the state and its beauty!



This is what you see when you pull up to wait for the ferry.  There is always a spare tug....you just

never know when you might need another one!

 
 
Vehicles line up and people get out of their vehicles while they wait for the ferry. 
 




Here it comes!!   You can't see it, but the tug powering the ferry is obscured by the extra tug.  The pilot glides up to the dock and a dock hand secures the ferry to the dock with large ropes.



 


Just a couple of motorcycles on this trip.  Sometimes there aren't any vehicles on a trip, but they have to go anyway to keep on their schedule.


There is another way to get here besides the ferry.   It just depends on which direction you need to go

whether you take it or not.  Sometimes though, you just need to ride it for the enjoyment!  There's

nothing like putting your tailgate down, sitting on it and enjoying the last ride of the day.  It's the

"sunset cruise"!!!
 

 





Saturday, September 15, 2012

The water line

As part of putting this farm in to use for cattle, we needed to install three freeze proof waterers. We will

have electric fences seperating the place in to five different paddocks as we are planning on utilizing

rotational grazing. That required a backhoe to come and dig the water line.  It needs to be approximatley

24" in our area as that is the freeze line.  First, in the country you've got to find out who has a backhoe

and when they can come.  So, after asking around, a name comes up, you ask around about their

reputation and then you give them a call.  You have to find out what they charge and if they can do the

job.  Then find out when they can come and hopefully they show when they say they will.  Before the

digging even started, we located a plastic pipe manufacturing facility that was fairly close (35 miles) and

spoke with them about purchasing 3000 feet of pipe.  No problem....they have what we need.  So we load

up in the wonderful green and white dump truck and head off to get our pipe.  The lines all get dug

and now comes the part of laying out the pipe and glueing them together.  Everything works pretty


good...we have a few snags such as a few of the pipe pieces not fitting snugly enough together to make

a good seal.  Somewhere in quality control, they missed these pieces.  So....you cut them apart and

reapply the glue and move on down the line.  Once the pipes are all laid and a riser attached, then

comes building forms for the concrete that will be poured to be under the waterers.